Skip to main content
Loading…
This section is included in your selections.

A. Easements shall be provided for all utility lines, including but not limited to water, sewer, storm water, gas, electric, telephone and cable television.

B. Easements shall be designed so as to provide efficient installation of utilities. Public utility installations shall be located so as to permit multiple installations within the easements.

C. Easements centered on rear or side lot lines shall be provided for utilities where necessary and shall be at a minimum of six feet (6') wide on each side of property lines. Easements shall be contiguous to the street at the end of the block to connect with adjoining blocks in the shortest direct line.

D. Where front line easements are required, a minimum of six feet (6') shall be allocated as a utility easement.

E. Where a subdivision is traversed by a water course, drainage way, channel or stream, there shall be provided a storm water easement or drainage right-of-way. Parallel streets or parkways may be required in connection therewith. (Ord. 711 §1 (Exh. A), 2017)