A. All gas, electric, telephone, cable television or other utility lines placed within the public right-of-way or dedicated easements shall be approved by the Town Manager as to location.

B. All utility installations shall be underground. Where underground distribution and/or service is to be provided at the front lot line, a utility easement for either or both the distribution lines and transformer pit shall be provided as needed.

C. All utility facilities shall be designed and constructed in accordance with the Town of Parachute Manual of Public Works Improvements, adopted as a separate regulation and as amended from time to time. (Ord. 711 §1 (Exh. A), 2017)