Skip to main content
Loading…
This section is included in your selections.

A. Purpose. The purpose of the preliminary plat is to provide the Town with an overall master plan for the proposed subdivision. It is more detailed than the sketch plan and should incorporate the comments and guidance provided during the sketch plan process. The Town will take formal action on a preliminary plat application.

B. Submittal Requirements. The applicant shall file a sufficient number of copies, as determined by the Town Manager, of the preliminary plat application and any additional information requested by the Town Manager. The applicant shall submit all required materials specified in Appendix 1.

C. Procedure. The preliminary plat application shall be reviewed by the Town in accordance with the review procedures chart at PMC 15.01.220. The Town Manager may waive the requirement for a preliminary plat if the proposed subdivision is not part of an overall master plan, is not a phased development, and/or if traffic studies, drainage reports, utility plans or other significant levels of engineering analysis are not required. (Ord. 711 §1 (Exh. A), 2017)